Kitchen In St Lawrence Terrace, London

SYSTEM (Basement Floor)

AmbiLowboard

SYSTEM (Upper Floors) AmbiPlate 80
INSTALLATION DATE July 2017

St Lawrence Terrace, London

Due to the project parameters, we recommended the use of our AmbiLowboard system on the basement floor and the AmbiPlate 80 system throughout the rest of the property. As the existing floors could not be lifted or disturbed, AmbiPlate 80 was the perfect solution, allowing the installation of the UFH system from beneath.

The Ambiente PRT/E control system was selected for controlling the underfloor heating, comprising 7-day programmable time and temperature settings across 4-time cycles, holiday mode, frost mode and many other user-friendly and energy-efficient functions.